PM Abbasi inaugurates LNG terminal at Port Qasim
KARACHI, AUG 27 (DNA) – Prime Minister Shahid Khaqan Abbasi says the government has ensured transparency in all the development projects in the country.
Addressing the inaugurating ceremony of the LNG terminal at Port Qasim in Karachi on Sunday, he said that the terminal has been completed within the record time of 330 days.
He said the bidding for LNG terminal was completely transparent.
The Prime Minister said that the terminal is second of its kind and will facilitate in transporting LNG to power house for producing cheap energy.
Shahid Khaqan Abbasi said that so far 100 cargo ships loaded with LNG have arrived at the first terminal. The terminal has a capacity to handle 750 million standard cubic feet gas per day.
He said that by end of November this year load shedding throughout the country will become history.
Related News
Dr. Oumer Hussein Obaassumes charge as Ethiopian Ambassador to Pakistan
DNA ISLAMABAD (December 18, 2025) — H.E. Dr. Oumer Hussein Oba has formally assumed hisRead More
Pakistan Libya Defence Cooperation Strengthened During Official Visit
RAWALPINDI, DEC 18 /DNA/: Field Marshal Syed Asim Munir, NI (M), HJ, COAS & CDF,Read More


Comments are Closed