Shehbaz inaugurates fully operational Bhikki Power Plant
SHEIKHUPURA, MAY 19 (DNA) – Punjab Chief Minister and ruling Pakistan Muslim League-Nawaz (PML-N) president Shahbaz Sharif on Saturday inaugurated the fully Operational Combined Cycle of 1180MW Bhikki Power Plant in Sheikhupura.
The punjab chief minister also visited its Control Room after inaugurated the Bhikki Power Plant.
Speaking on the occasion, Shehbaz Sharif said that today is the historic day as loadshedding is being eliminted from the country with the struggle of PML-N government.
He said that the Bhikki Power Plant has been constructed with the revenue of the provincial government, adding that the project was completed transparently.
The chief minister said that Haveli Bahadur Shah, Bhikki power plant and Balloki have added 3600 MW in the national grid.
The Punjab Chief Minister said that Haveli Bahadur Shah Plant, Balloki Plant and Bhikki, all three power plants are operational. “I believe all those involved in making these projects successful deserve applause,” the chief minister said.
Taking a jibe at his political opponents, Shehbaz said that those who stagged a sit-in have wasted PML-N’s government’s first year which caused a huge loss to the country’s economy. The nation will not pardon those who stagged sit-in, he added.
“PTI chairman Imran Khan had promised to provide electrivity to whole country,” he said and added his party-led government generated minus six megawatt electricity during its tenure.
“The PML-N’s every work is for the betterment of the country.”
Related News
German Embassy Hosts Annual Alumni Gathering in Islamabad
ISLAMABAD, FEB 1 (DNA):The German Embassy in Islamabad hosted its annual Alumni gathering, bringing togetherRead More
ISSI, SPRC sign MoU to boost Intra-Regional Trade Research
ISLAMABAD, JAN 31 /DNA/ – The Institute of Strategic Studies Islamabad (ISSI) has formalized aRead More
Comments are Closed